Reference project

Vrbas Project

The Vrbas plant is located in Vrbas, Serbia. The plant, with a thermal capacity of 6 MWth, was commissioned in 2022 and utilises residues from the sugar industry, mainly sugar beet pulp.

Project overview

Vrbas (RS) 6 MWth

LocationVrbas, Serbia
Capacity6 MWth
CommissioningIn 2022
FeedstocksResidues from the sugar industry, mainly sugar beet pulp

Geographic location

Plant location

Vrbas, Vojvodina, Serbia

World map showing the location of Vrbas in Serbia
The marker shows the location of the plant in Vrbas in Serbia’s Vojvodina region.

Project contribution

My scope of services

My personal scope of services for this project included in particular:

  • Further development of the technological planning
  • Support during plant construction
  • Commissioning

Project impressions

Impressions from the Vrbas project

Silos
Silos
Dosierbunker
Dosing bunker
Biosuspensionstank
Biosuspension tank
Hauptfermenter
Main fermenter
Hauptfermenter – Ansicht von oben
Main fermenter – top view
Nachfermenter mit Donut-Gasspeicher
Post fermenter with donut gas storage
Separatoren
Separators
Gasentschwefelung
Gas desulphurisation
Rohrleitungskollektor
Pipeline collector
Steuerzentrale
Control centre